Trade Services
Stucco & EIFS in South Florida
In this climate, a stucco failure is almost always a water failure.
Cracking, staining and delamination are usually symptoms: water got behind the system and had nowhere to go. We price the drainage plane, the flashing and the terminations alongside the finish, because those are the parts that decide whether the wall survives the next ten summers.
Stucco & EIFS
What the package covers
- 01Lath, accessories and three-coat stucco over masonry and frame walls
- 02EIFS and drainage-plane assemblies installed to the manufacturer's detail
- 03Weather-resistive barrier, flashing and sealant terminations
- 04Control and expansion joints placed to the layout, not to convenience
- 05Crack repair, patching and surface preparation before recoating
- 06Texture matching on repairs and additions
- 07Banding, trim profiles and architectural foam shapes
Exclusions
What it does not cover
Published on purpose. A bid is only comparable when both sides know where it stops.
- 01Structural repair of the substrate behind the system
- 02Window and door supply — we flash and seal what is installed
- 03Roofing, and roof-to-wall flashing furnished by the roofing scope
- 04Painting and final coating, unless carried in the same package
- 05Moisture surveys and forensic investigation
Where it applies
- Exterior renovation of residential and commercial buildings
- Coastal exposures where the coating system is selected for salt and UV
- Additions and openings that have to match an existing texture
- Repairs opened up after water intrusion has been traced
How it coordinates
- Windows and doors installed and flashed before the system is closed
- Penetrations by other trades located before lath, not cut in afterwards
- Cure time before coating — rushing it is what causes efflorescence
- Joint layout reviewed against the elevation, since it will be visible forever
+1 (754) 202-2971
Send the drawings.
Tell us the project, the scope you need priced and the date you need the number. If the documents raise a question that changes the price, we will ask it before we quote, not after.
