Pre-Construction Services in Miami & South Florida

The cheapest place to solve a construction problem is before construction starts.

Pre-construction turns design intent into a buildable scope, a realistic budget and a working sequence. We review the documents, identify missing information, coordinate trade input, study long-lead materials and organize approvals before the project begins consuming field time and owner money.

What's Included

Pre-Construction

  • 01Conceptual and detailed cost estimating
  • 02Constructability review
  • 03Value engineering and material alternatives
  • 04Trade scope development and bid leveling
  • 05Permit and approval strategy
  • 06Long-lead procurement planning
  • 07Master schedule and trade sequencing
  • 08Owner decision and selection schedule

Our Process

How we work, step by step

  • 01

    Project Definition

    We define what the project must accomplish, what information already exists and what still has to be resolved before reliable pricing is possible.

  • 02

    Document & Constructability Review

    Plans and specifications are reviewed against existing conditions, trade interfaces and the sequence required to build the work.

  • 03

    Scope & Pricing

    Trade scopes are written clearly enough that proposals can be compared on the same basis. Allowances, exclusions and missing decisions are shown instead of buried.

  • 04

    Value Engineering

    Alternatives are studied for cost, lead time, maintenance and effect on the design. The objective is not simply to make the project cheaper; it is to spend money where it has the most value.

  • 05

    Approvals & Procurement

    Permit strategy, association or landlord packages, long-lead materials and owner selections are mapped against the schedule before mobilization.

  • 06

    Construction Plan

    The final pre-construction package becomes the working baseline for budget, procurement, trade sequence and the construction schedule.

Pre-Construction

Questions we get asked

  • When should pre-construction start?

    As soon as the project has enough definition to evaluate scope and constraints, and before major purchases or construction commitments are made.

  • Can Lordes price a project before drawings are complete?

    Yes, at a conceptual level. The estimate should clearly identify assumptions and allowances until the documents are complete enough for trade-level pricing.

  • Does pre-construction include permit coordination?

    It includes planning the approval path, identifying required documents and coordinating the construction scope with the professionals and trades responsible for the applicable submissions.

  • What is the deliverable?

    A clearer scope, a more defensible budget, a procurement plan and a working sequence that construction can actually follow.