Skip to content
LordesDevelopment
Custom kitchen with island and premium finishes by Lordes Development

Our Services

Kitchen Remodeling in Miami & South Florida

South Florida homes deserve kitchens that are beautiful, functional, and built with precision.

We turn outdated kitchens into elegant, high-performing spaces designed for cooking, gathering, and entertaining.

What's Included

Kitchen Remodeling

  • 01Full demolition of cabinets, countertops, backsplash, and flooring
  • 02Furniture-grade custom cabinetry with soft-close hardware
  • 03Premium quartz, porcelain, or natural stone countertops
  • 04Precision-engineered island millwork and pull-out storage
  • 05Electrical rework and layered lighting design
  • 06Plumbing, appliance integration, and final finishing

What a kitchen remodel in Miami involves

A kitchen is the most coordinated room in a home. Cabinetry, stone, appliances, plumbing, gas, electrical, ventilation and lighting all meet within fractions of an inch, and each one is ordered weeks before it is installed. When a kitchen runs late or over budget, it is almost never the installation that failed; it is a decision that was made after something had already been fabricated.

So the design is closed first. Appliance models are chosen before cabinets are drawn, cabinets are drawn before the electrician roughs in, and the stone is templated only when the cabinets are set and level. That order is not negotiable, and holding it is most of what project management means in a kitchen.

Cabinetry: where the budget and the result are decided

Cabinetry is typically the largest single line in a kitchen and the one with the widest range. Semi-custom lines work in fixed increments and fillers; custom millwork is built to the room, with full-height panels, integrated appliances, continuous grain and interiors designed around what you actually store.

We field-measure after demolition, produce shop drawings and review them with you before anything is cut. Soft-close hardware, moisture-resistant boxes and finishes that tolerate humidity are the baseline, not upgrades.

Countertops and backsplash

Quartz is consistent and asks for no maintenance. Porcelain slabs take heat and sun without changing colour, which matters in a kitchen that opens to a terrace. Natural quartzite and marble are chosen slab by slab for their veining, and need sealing. Seams, veining direction and edge details — mitred, waterfall, eased — are laid out on the shop drawing, so the slab you chose at the yard is the kitchen you get.

A full-height slab backsplash removes grout from the wall you clean most. It also demands that outlets, switches and the hood be positioned before the stone is cut, which is one more reason the electrical plan comes early.

Electrical, plumbing and ventilation

Older Miami kitchens were wired for a refrigerator and a range. A modern one adds an induction cooktop or a gas line, wall ovens, a dishwasher or two, a wine column, under-cabinet lighting and a dozen countertop outlets on dedicated, GFCI-protected circuits. We check panel capacity at the start, because an upgrade is far easier to plan than to discover.

Moving the sink to an island means a new drain and vent through the slab or the floor below; in a condominium that depends on what the building allows. Hoods are ducted outdoors wherever the structure permits. These scopes are permitted work, filed by the licensed trades that perform them.

How long a kitchen remodel takes

On site, a kitchen takes eight to fourteen weeks. Before that, cabinetry needs six to eight weeks from approved shop drawings — longer for furniture-grade millwork — and appliances and stone are ordered in parallel. We schedule demolition backwards from the cabinet delivery date, so your old kitchen stays usable for as long as possible and the house is without one for the shortest time we can manage.

Stone is templated once the cabinets are installed and comes back fabricated one to two weeks later. Backsplash, plumbing trim and appliances follow. We give you those dates at the start.

Investment

What a kitchen remodel costs in Miami

Kitchens vary more than any other room. These are the ranges where our projects usually land in 2026. Appliances are budgeted separately, because a package can be $10,000 or $100,000.

  • Same layout, fully rebuilt

    $55,000 – $90,000

    New cabinetry, quartz or porcelain countertops, backsplash, sink and fixtures, lighting and flooring, with plumbing and appliances in their current positions.

  • Reconfigured kitchen

    $90,000 – $160,000

    Walls opened, an island added or moved, new circuits and panel work, relocated plumbing or gas, custom cabinetry and natural stone.

  • Full custom millwork kitchen

    $160,000 – $300,000+

    Furniture-grade millwork with integrated appliances, book-matched slabs with mitred edges, a pantry or scullery, and a lighting design.

What moves the number

  • Cabinetry grade. Semi-custom, custom and furniture-grade millwork can differ by a factor of three for the same footprint.
  • Layout changes. Every wall, drain or gas line that moves adds trades, permits and time.
  • Stone. The slab itself, the number of slabs, mitred edges and a full-height backsplash.
  • Electrical capacity. New dedicated circuits, and a panel upgrade when the existing one is full.
  • Appliances. Integrated, panel-ready and professional lines change the cabinetry as well as the invoice.

Planning ranges for projects in Miami-Dade and Broward, including labour, materials, project management and protection of the home. Your budget is defined in a written, line-item scope after a site visit.

Our Process

How we work, step by step

  • 01

    Measure & Design

    We measure the existing space, map plumbing and electrical, and lay out a kitchen that works for how you actually cook.

  • 02

    Selections Locked

    Cabinets, stone, tile, fixtures and appliances chosen and ordered before demolition. Cabinetry runs six to eight weeks; ordering late is what stalls kitchens.

  • 03

    Demolition & Rough-In

    Old kitchen out, then plumbing and electrical moved to the new layout while the walls are still open.

  • 04

    Cabinets & Stone

    Cabinets set and leveled, then countertops templated on the installed boxes so the stone fits the room, not the drawing.

  • 05

    Finish & Function Check

    Backsplash, hardware, lighting and appliances. We run every drawer, door and outlet before handing it over.

Selected Work

Kitchens and the rooms they open onto

Kitchen Remodeling

Questions we get asked

  • How much does a kitchen remodel cost in Miami?

    Most of our kitchens fall between $55,000 and $160,000 before appliances, depending on cabinetry, stone and whether the layout changes. Furniture-grade millwork kitchens run higher. The budget is set in a written, line-item scope.

  • How long does a kitchen remodel take?

    Eight to fourteen weeks on site. Cabinetry adds six to eight weeks of fabrication beforehand, during which your existing kitchen stays in use.

  • Do I need a permit to remodel my kitchen?

    For new circuits, relocated plumbing or gas, or removed walls, yes. The licensed trades file their permits and we schedule around the review. Whether replacing cabinets and countertops in place needs one depends on the municipality; we confirm it for your address.

  • Can I live at home during a kitchen remodel?

    Yes; most clients do. We set up dust barriers, protect the floors and keep a path clear. Plan for eight to fourteen weeks without a working kitchen; we can help you plan a temporary one with the old refrigerator and a sink.

  • Do you design the kitchen or work with my designer?

    Both. We build from an architect's or designer's drawings, and for clients who come without them we develop the layout, cabinetry drawings and selections as part of pre-construction.

  • Can you remove a wall to open the kitchen?

    Often, yes. First we establish whether the wall is structural and what runs inside it. Structural changes are designed by an engineer and permitted; in a condominium they also need the association's approval.

Ready to start your kitchen remodeling project?