Skip to content
LordesDevelopment
Freestanding tub against a book-matched travertine wall, lit from a cove above

Our Services

Bathroom Remodeling in Miami & South Florida

Bathrooms built for luxury and longevity across South Florida.

Waterproofing done right, premium stone and tile, and fixtures installed to last — not just to look good on handover day.

What's Included

Bathroom Remodeling

  • 01Demolition and full waterproofing system
  • 02Shower pans, niches, and curbless conversions
  • 03Porcelain, natural stone, and large-format tile
  • 04Vanities, custom millwork, and integrated storage
  • 05Plumbing rework and premium fixture installation
  • 06Ventilation, lighting, and finish carpentry

What a full bathroom remodel in Miami involves

A bathroom is the smallest room in the house and the one with the most trades in it. Demolition, plumbing, electrical, waterproofing, tile, stone, glass, millwork and paint all pass through a few dozen square feet, in a fixed order, and each one depends on the tolerances the previous one left behind. A wall that is a quarter inch out of plumb is invisible in drywall and obvious in large-format tile.

That is why we treat a bathroom as a sequenced project and not as a list of finishes. The layout, the drain positions, the valve heights, the niche sizes and the tile module are drawn and agreed before demolition, so the plumber sets the rough-in for the fixtures you actually chose and the tile setter never has to solve on site what should have been solved on paper.

Waterproofing is the part you never see

Tile and grout are not waterproof. What keeps water out of the slab, the wall cavity and the unit below is the membrane behind them, and in South Florida's humidity a failed membrane does not stay a small problem for long. Most of the bathrooms we demolish tell the same story: tile set on drywall, or on a shower pan that was never tested.

We build the wet area as a continuous system — sloped pan, bonded membrane on floor and walls, sealed corners, niches and valve penetrations — and we flood-test the shower before a single tile is set. On permitted work the pan is also inspected. It adds a day to the schedule and removes the most expensive failure a bathroom can have.

Materials that hold up in South Florida

Porcelain is the workhorse: dense, stain-proof and available in large formats that leave very few grout joints. Natural stone — travertine, marble, quartzite — gives a wall or a vanity top a depth porcelain only imitates, and it asks for sealing and a little care in return. We tell you where each one earns its place: stone where you look, porcelain where water sits.

The same logic applies to everything behind the finish: cement or foam backer board instead of drywall in wet areas, solid-brass valves that can be serviced from the front, vanities built on moisture-resistant cores, and an exhaust fan sized for the room and ducted outdoors, not into the attic or the ceiling void.

Permits, condo rules and inspections

Replacing finishes is one thing; moving a drain, adding circuits or changing a layout is permitted work in Miami-Dade and Broward. The permits are filed by the licensed trades responsible for each scope, and the review time — which varies from one municipality to the next — goes into the schedule from day one, so demolition does not start on a date the paperwork cannot support.

In a condominium there is a second approval: the association. Most buildings ask for a description of the scope, insurance certificates, work hours, elevator reservations and, under hard flooring, an acoustic underlayment with a tested rating. We prepare that package as part of the job and plan water shut-offs with building management, because the riser serves your neighbours too.

How long a bathroom remodel takes

Construction on a guest bathroom typically runs four to six weeks; a primary bathroom with custom millwork, stone and glass, six to ten. The calendar before construction matters just as much: selections, shop drawings and long-lead items such as vanities, slabs and custom glass take several weeks, and we do not demolish until the materials that control the sequence are confirmed.

Shower glass is measured only after the tile is finished, so it is always the last thing to arrive — usually one to two weeks after tile. We tell you that at the start, with dates, rather than at the end.

Investment

What a bathroom remodel costs in Miami

Every bathroom we build is priced from a written scope, line by line. These are the ranges where our projects usually land in 2026, so you can plan before the first visit.

  • Guest or hall bathroom

    $28,000 – $45,000

    Full demolition, new waterproofing, porcelain tile on floor and wet walls, a vanity with a quartz or porcelain top, fixtures, frameless glass and lighting. Plumbing stays where it is.

  • Primary bathroom

    $45,000 – $85,000

    A larger wet area, a double vanity in custom millwork, a curbless shower or a freestanding tub, large-format tile or natural stone, and layered lighting.

  • Primary bathroom, reconfigured

    $85,000 – $150,000+

    Drains and walls relocated, book-matched stone slabs, custom glass, steam or a wet room, and millwork designed for the space.

What moves the number

  • Moving plumbing. Keeping the toilet, shower and vanity where they are is the largest saving available; relocating a drain in a concrete slab or in a high-rise is the largest single cost.
  • The wet area. A curbless shower, a bench, niches and full-height tile add waterproofing and labour, not just material.
  • Stone and tile format. Slabs and large-format porcelain cost more to buy and considerably more to handle, cut and set.
  • Millwork and glass. A custom vanity and custom-cut glass are made to measure; standard sizes are not.
  • The building. In a condominium, elevator windows, work hours, protection and association requirements add time, and time is cost.

Planning ranges for projects in Miami-Dade and Broward, including labour, materials, project management and protection of the home. Your budget is defined in a written, line-item scope after a site visit.

Our Process

How we work, step by step

  • 01

    Assessment

    We check what is behind the tile. Hidden moisture damage decides the real scope of a bathroom, not the finishes.

  • 02

    Layout & Selections

    Fixture positions, shower type and drainage settled first; stone and tile chosen against them.

  • 03

    Demolition & Waterproofing

    Down to the substrate, then a full waterproofing system with a flood test before a single tile goes on.

  • 04

    Tile & Stone

    Large-format and natural stone set with the layout planned so cuts land where they are least visible.

  • 05

    Fixtures & Seal

    Glass, vanities and fittings installed, everything sealed, and every joint checked for movement.

Selected Work

Bathrooms from recent projects

Bathroom Remodeling

Questions we get asked

  • How much does a bathroom remodel cost in Miami?

    Most of our full bathroom remodels fall between $28,000 and $85,000, depending on size, materials and whether plumbing moves. Reconfigured primary bathrooms with stone slabs and custom millwork run higher. The number is set in a written, line-item scope after we see the space.

  • How long does a bathroom remodel take?

    Four to six weeks of construction for a guest bathroom and six to ten for a primary bathroom, once materials are confirmed. Selections, shop drawings and long-lead orders add several weeks before demolition.

  • Do I need a permit to remodel a bathroom in Miami-Dade?

    If the work changes plumbing, electrical or layout, yes. Permits are filed by the licensed trades responsible for each scope, and the review time goes into the schedule. In a condominium you also need the association's approval.

  • Can you convert a tub into a walk-in or curbless shower?

    Yes; it is one of the most common requests. A curbless shower needs the floor recessed or re-sloped and the drain and waterproofing redesigned, so we confirm what the slab allows before promising it — especially in a high-rise.

  • Can I use the bathroom during the remodel?

    Not the one under construction. If it is the only bathroom in the home, we plan the sequence around that and tell you exactly which days there will be no water.

  • Do you remodel bathrooms in condos and high-rises?

    Yes. We prepare the association package, reserve elevators, protect common areas, coordinate water shut-offs with management and install the acoustic underlayment the building requires.

  • Do you supply the tile, fixtures and vanity, or can I buy them?

    Either. We can source everything and include it in the budget, or install materials you supply. What matters is that every item is selected and confirmed before demolition, because the rough-in depends on it.

Ready to start your bathroom remodeling project?