Trade Services
Concrete & Foundation Work in South Florida
The one scope where a mistake is still there in thirty years.
Concrete is unforgiving in both directions: it is the hardest scope to correct after the fact and the easiest to get right with preparation. We price formwork, reinforcement, placement and finish against the structural drawings and the inspection sequence that governs them.
Concrete & Foundation
What the package covers
- 01Formwork, shoring and reshoring to the structural design
- 02Reinforcement placement, laps and cover to the drawings
- 03Footings, grade beams, slabs on grade and suspended slabs
- 04Foundation repair, underpinning and structural patching
- 05Placement, consolidation, curing and protection
- 06Finishes: trowel, broom, exposed and polished substrates
- 07Slab preparation, levelling and moisture testing before flooring

Exclusions
What it does not cover
Published on purpose. A bid is only comparable when both sides know where it stops.
- 01Structural engineering, threshold inspection and testing laboratory
- 02Soil work, compaction testing and geotechnical reporting
- 03Waterproofing membranes furnished under a separate scope
- 04Post-tension design, and repair of existing post-tension systems
- 05Demolition of existing structure unless carried in the same package
Where it applies
- Additions, structural slabs and foundation work on residential projects
- Commercial slabs, pads and site concrete
- Repair of spalling, cracking and corrosion in coastal structures
- Slab preparation where a high-tolerance floor finish follows
How it coordinates
- Sleeves, embeds and under-slab MEP set and inspected before placement
- Inspection sequence honoured — nothing gets poured over an open item
- Placement scheduled around delivery, weather and cure, not around convenience
- Flatness and moisture criteria agreed with whoever installs the floor finish
+1 (754) 202-2971
Send the drawings.
Tell us the project, the scope you need priced and the date you need the number. If the documents raise a question that changes the price, we will ask it before we quote, not after.
