Trade Services
Acoustical & Specialty Ceilings in South Florida
The ceiling is where every other trade ends up. It gets laid out first.
A ceiling plan is a coordination drawing pretending to be a finish. Grid, lights, diffusers, sprinklers, speakers and sensors all land in the same plane, and whoever installs last pays for the ones that do not line up. We set the layout against the reflected ceiling plan before the first hanger wire goes in.
ACT / Acoustical Ceilings
What the package covers
- 01Suspended grid: hangers, main runners, cross tees and perimeter trim
- 02Acoustical tile and panel installation, including rated assemblies
- 03Seismic and lateral bracing where required by the design
- 04Specialty ceilings: wood and metal slat, baffles, clouds and open cell
- 05Gypsum ceiling coordination where the two systems meet
- 06Access and lay-in coordination for equipment above the ceiling
- 07Trim, reveals and transitions at walls and bulkheads

Exclusions
What it does not cover
Published on purpose. A bid is only comparable when both sides know where it stops.
- 01Light fixtures, diffusers, sprinkler heads and devices — set by their own trades
- 02Above-ceiling MEP, structure and firestopping
- 03Gypsum board framing — priced under Drywall & Metal Framing
- 04Painting of exposed structure above an open ceiling
- 05Acoustic design and sound testing
Where it applies
- Office, retail, medical and wellness interiors
- Hospitality spaces with feature and specialty ceilings
- Residential and amenity areas with slat and baffle systems
- Renovations where the existing grid is partly reused
How it coordinates
- Layout set from the reflected ceiling plan, centred before anything is hung
- MEP above the ceiling complete and inspected before tile goes in
- Fixture cut-outs coordinated with the electrical scope, not improvised
- Tile installed late enough to avoid damage, early enough to close the job
+1 (754) 202-2971
Send the drawings.
Tell us the project, the scope you need priced and the date you need the number. If the documents raise a question that changes the price, we will ask it before we quote, not after.